[YOUR COMPANY NAME] [Address] · [Phone] · [Email] · License # [________] ROOFING PROPOSAL Date: [________] Proposal #: [________] Valid for: 30 days PREPARED FOR Name: [________] Property: [________] Phone / email: [________] PROJECT Roof size: [__] squares · Pitch: [__/12] · Existing layers: [__] Job type: [ ] Cash [ ] Insurance claim Carrier: [________] Claim #: [________] 1. SCOPE OF WORK - Tear off [__] layer(s) of existing roofing down to the deck. Dumpster and disposal included. - Inspect roof deck after tear-off (see Decking Allowance). - Install [synthetic underlayment] over the full deck. - Install ice & water shield at eaves ([__] in. past the interior wall line), in all valleys, and around penetrations. - Install new drip edge at eaves and rakes. Color: [________] - Replace step flashing, valley flashing and pipe boots. Chimney flashing: [replace / reseal / by others] - Ventilation: [ridge vent __ lf / box vents / existing to remain]. Intake: [soffit / existing] - Install [manufacturer, product line, color] shingles per manufacturer instructions, [__]-nail pattern. - Starter strip at eaves and rakes; [hip and ridge cap product]. - Clean-up: magnetic nail sweep of yard and driveway on completion. 2. DECKING ALLOWANCE Included: up to [__] sheets of 7/16" OSB. Additional sheets: $[__] per sheet installed. We will photograph damaged decking and notify you before replacement. 3. PRICE Cash job: Total $[________]. Deposit $[____] due [at signing / material delivery]. Balance due on completion. Insurance job: Your deductible of $[____] is due [at material delivery]. The balance is paid from insurance proceeds. Recoverable depreciation released by the carrier after completion is payable to [Company]. Supplements for code-required items not in the carrier's estimate will be submitted to the carrier. 4. WARRANTY Shingles: manufacturer's limited warranty per [manufacturer]'s terms ([__] years). Workmanship: [__]-year [Company] warranty on installation. 5. EXCLUSIONS Not included unless listed above: skylight replacement, gutter replacement, chimney repair, solar or satellite removal and reinstall, interior repairs, structural framing repair. 6. CHANGE ORDERS Work not described above requires a written change order signed by both parties before it is performed. 7. ACCEPTANCE Customer signature: ________________ Date: ________ [Company] representative: ________________ Date: ________